Accepted Projects Details
Showing Record(s) 1 to 100 of Total 342 Green Box -Projects where all Issues are resolved
S.No Project Name Agency-Department Description Of Projects
(As furnished by the applicant)
Estimated Investment(in Crores)
1 PARBATPUR CENTRAL COAL MINE  MOC/NA  The project was allotted to Steel Authority of India Limited on 23.03.2016 by MoC, GOI.The project consist of an opencast and an underground mine of total planned production as per approved Mine Plan is 1.24MT.
2 Badam Coal Mine  MOC/NA  The Badam Coal Mine was allotted to Bihar State Power Generation Co. Ltd., Patna for its 2x250 MW BTPS Extension Project, Barauni, Begusarai vide Allotment Order No. 103/20/2015/NA dated 31.08.2015 of MoC, GoI.
3 NLC TALABIRA THERMAL POWER PROJECT  Neyveli Lignite Corporation  Talabira Mine II & III Coal block is allocated to NLCIL. A pit head Thermal Power Project is planned near Talabira Mines. 17636.78
4 TS II SECOND EXPANSION PROJECT  Neyveli Lignite Corporation  In lieu of instructions from MOEF&CC to go for super critical boiler techniques (2X660MW) instead of 1000 MW earlier. Accordingly approval was obtained to increase linked Mine III capacity from 9.0 to 11.50 MTPA on 09.08.2016. 8733.49
5 MINE III  Neyveli Lignite Corporation  Board of Directors of NLCIL has accorded approval for the expenditure sanction of Rs. 7.05 Crores for Phase-I AAP activities on 23.03.2015. In lieu of instructions from MOEF&CC to go for super critical boiler techniques (2X660MW) instead of 1000 MW earlier. Accordingly approval was obtained to increase Mine capacity from 9.0 to 11.50 MTPA on 09.08.2016.
6 Dumri Coal Block  MOC/NA  Dumri Coal Mine, located in the State of Jharkhand, was vested to M/s Hidnalco through E-auction conducted by the Ministry of Coal, GoI, in 2015 and subsequently the Nominated Authority, MoC, Govt. of India issued the Vesting Order in favour of Hindalco Industries Limited vide Order no.104/24/2015/NA. dated 22-04-2015. The Mine was auctioned in the category of Schedule III Mines with EC and FC stage I already granted to the Prior Allotee of the Block. The prior allotee has also purchased and mutated 410 acres of non forest private land for the purchase of transfer as compensatory afforestation land to Forest Dept for getting stage II FC. The Mine is planned for opening by 22nd Dec 2018 as per the CMPDA signed for getting the vesting order of the Mine. 120
7 Selected Dhori OC  Coal India Limited  Selected Dhori (SDOC) is a brown field open cast coal mining project located in Bokaro district. The project is in Dhori Area of CCL and has a capacity of 11 MTPA.
8 Balkudra OC  Coal India Limited  Balkudra OC is a brown field open cast coal mining project located in Ramgarh district. The project is in Barka Sayal Area of CCL and has a capacity of 1.3 MTPA.
9 Basantpur Tapin Washery  Coal India Limited  Basantpur Tapin Washery is a coking coal washery located in Ramgarh district. It is a greenfield project with a capacity of 4 MTPA.
10 Gare Palma Sector - I, Phase - I integrated (Opencast & Captive Coal Washery)  MOC/NA  Gare Palma Sector - I, Phase - I integrated (Opencast & Captive Coal Washery) mining project in Mand Raigarh Coalfield, Raigarh district in Chhattisgarh State: Coal block is allotted by Ministry of Coal. Mine is having opencast peak rated capacity of 15 MTPA. Total Block Area: 5738.75 Ha. Phase - I area: 3583.81 Ha. 15280.13
11 Amelia Coal Mine  MOC/NA  Amelia Coal Mine is located at Singrauli Distt. of MP State. It is in Main Basin of Singrauli Coal Field. Prior allottee is MP State Mining corporation Ltd, MP. The Mine has been re-allotted to THDCIL vide allotted order no. F. No.103/11/2016-NA Dtd.17.01.2017. The end use plant is Khurja STPP(2x660MW), Khurja, Bulandshahar, UP. As per approved Mine plan, total extractable coal reserve is 277.23 Million Ton. PRC is 7.0 OC & 1.4 UG. As per schedule, opening permission is to be granted in Sept. 2020. Land acquisition and Forest clearance proposal is under process. 1587.16
12 Bicharpur Coal Mine  MOC/NA  Bicharpur Coal Mine was vested to UTCL on 01-04-2015. BCM is and underground coal mine.Prior allocatee had started development of mine (drivage of Inclines 2X1200 m and Sinking of Shaft 220 mts). 6 % of developemnt work was completed and balance 94% of development work is being done by UltraTech Cement Limited. 563
13 Gare Palma IV/4 Coal Mine  MOC/NA  Gare Palma IV/4 Coal Mine, Raigarh, Chattisgarh Gare area is located in Mand Raigarh coalfield and is a large area containing about 3000 million tonnes of coal as per GSI estimate. This area has been divided into 4 sectors viz. I to IV. Sector IV has further been sub-divided into 8 sub-blocks namely IV/1 to IV/8. Gare Palma IV/4 coal blocks was earlier allotted to M/s Jayswal Neco India Limited (JNIL) for captive coal mining. Honourable Supreme Court vide judgment dated 25th August 2014 read with its order dated 24th September 2014 cancelled the allotments of 204 coal blocks including Gare Palma IV/4. In pursuance of the provisions of The Coal Mines (Special Provisions) Second Ordinance 2014, these coal mines were earmarked for non-regulated sector and was put on E-auction by the union government, in which M/S Hindalco Industries Limited emerged as the successful bidder. Accordingly, this coal mine has been vested with M/S Hindalco Industries Limited w.e.f 1st April 2015, vide vesting order no. 104/16/2015/NA dated 23rd March 2015. Subsequently, the block boundary of Gare Palma IV/4 coal mine was revised vide F. No. 104/28/2015/NA dated 13th October 2015 of Nominated Authority, Ministry of Coal, Government of India and certified by CMPDIL vide letter no. CMPDI/BD/C(886-A)/E-175692/I-4079 dated 3rd July 2018. Post certification of block boundary by CMPDIL, area of Gare Palma IV/4 is 885.525 ha. Location and Accessibility Gare Palma IV/4 coal mine is in Gare area of Mand Raigarh Coalfield (south-eastern part) falls under the administrative control of Tamnar Tehsil, Raigarh district in Chhattisgarh. The relevant Topo sheets are 64 N/8 & 12. Gare Palma IV/4 Block is connected to Raigarh, the district headquarters by road. The block is situated at a distance of 55 km from Raigarh. Raigarh is the nearest Railhead on the Howrah Mumbai line of South East Central Railway. Raipur is the nearest airport to the coal mine, which is situated around 330 km from the project site and connected by all-weather road. As per vesting order, coal from this coal mine will be used for captive consumption in the end use plant in Aditya & Hirakud. The Net Geological Reserves (post exploration) is 65 MT. Method of Current Working Coal Production is being done since June, 2006 in Gare Palma IV/4. After re-allocation, due to delay in obtaining required permissions, production was restarted from Gare Palma IV/4 from December 2015. The mines achieved Peak Rated Production of 1MTPA in FY 2016-17. Underground- Drilling Blasting in Bord & pillar method with LHD and evacuation by Belt Conveyor. Open cast- Drilling Blasting/ Shovel Dumper combination/ Ripper Dozer/Surface Miner. 5.5 MT of reserves have been extracted till 31st March 2018 from this mine since inception. 162.23
14 Gare Palma IV/5 Coal Mine  MOC/NA  Gare Palma IV/5 Coal Mine, Raigarh, Chattisgarh Gare area is located in Mand Raigarh coalfield and is a large area containing about 3000 million tonnes of coal as per GSI estimate. This area has been divided into 4 sectors viz. I to IV. Sector IV has further been sub-divided into 8 sub-blocks namely IV/1 to IV/8. Gare Palma IV/5 coal block was earlier allotted to M/s Monnet Ispat & Energy Limited (MIEL) for captive coal mining. Honourable Supreme Court vide judgment dated 25th August 2014 read with its order dated 24th September 2014 cancelled the allotments of 204 coal blocks including Gare Palma IV/5. In pursuance of the provisions of The Coal Mines (Special Provisions) Second Ordinance 2014, these coal mines were earmarked for non-regulated sector and was put on E-auction by the union government, in which M/S Hindalco Industries Limited emerged as the successful bidder. Accordingly, this coal mine has been vested with M/S Hindalco Industries Limited w.e.f 1st April 2015, vide vesting order no. 104/13/2015/NA dated 23rd March 2015. Subsequently, the block boundary of Gare Palma IV/5 coal mine was revised vide F. No. 104/28/2015/NA dated 13th October 2015 of Nominated Authority, Ministry of Coal, Government of India and certified by CMPDIL vide letter no. CMPDI/BD/C(886-A)/E-175692/I-4079 dated 3rd July 2018. Post certification of block boundary by CMPDIL, area of Gare Palma IV/5 is 797. 66 ha. Location and Accessibility: Gare Palma IV/5 coal mine is in Gare area of Mand Raigarh Coalfield (south-eastern part) falls under the administrative control of Tamnar Tehsil, Raigarh district in Chhattisgarh state. The relevant Topo sheets are 64 N/12. The Gare Palma IV/5 Block is connected to Raigarh, the district headquarters by road. The block is situated at a distance of 55 km from Raigarh. Raigarh is the nearest Railhead on the Howrah Mumbai line of South East Central Railway. Raipur is the nearest airport to the coal mine, which is situated around 330 km from the project site and connected by all weather road. As per vesting order, coal from this coal mine will be used for captive consumption in the end use plant in Aditya & Hirakud. The Net Geological Reserves (post exploration) is 143 MT. Method of Current Working- Coal Production is being done since 2004 in Gare Palma IV/5. After re-allocation, due to delay in obtaining required permissions, production was restarted from Gare Palma IV/5 from April 2016. The mine has achieved Peak Rated Production of 1MTPA each in FY 2016-17. Underground- Drilling Blasting in Bord & pillar method with LHD and evacuation by Belt Conveyor. Open cast- Drilling Blasting/ Shovel Dumper combination/ Ripper Dozer/Surface Miner. 10 MT of reserves have been extracted till 31st March 2018 from this mine since inception. Along with development of coal seams in underground, depillaring with stowing by bottom ash / crushed OB have been initiated in Seam II of Gare Palma IV/5 as pilot project with the permission of DGMS. 181.83
15 Detailed coal exploration in Mahan North and Mahan South Block, Bisrampur Coalfield  Coal India Limited  Detailed coal exploration in Mahan North and Mahan South Block, Bisrampur Coalfield, District - Balrampur and Surguja, Approximate area of block 54.5 Sq.Km., Anticipated Meterage 43000 m. Work order issued on 22.03.2016.Drilling started on 23.03.2016 and a total of 3498.5m was drilled till 24th July 2016.Drilling stopped due to stiff local resistance. No drilling since 24 July 2016. 7.5
16 PSPCL - Pachwara Central Coal Mining Project  MOC/NA  blank 400
17 Araanya Mines Pvt. Ltd. - Lohari Coal Mine  MOC/NA  Lohari Coal Mine allotted under auction to M/s Araanya Mines Pvt. Ltd. a Joint Venture (JV) of M/s Aloke Steels Industries Pvt. Ltd. and M/s Maa Chhinnmastika Cement and Ispat Pvt. Ltd. both the JV Units having DRI (Sponge Iron) Units. The coal is the major raw material for DRI production. The mined coal will be used for production of Sponge Iron. The Vesting Order is issued vide order no. 104/30/2015/NA dt-22.04.2015 505
18 Detailed coal exploration in Haripur Chaparia Block, Rajmahal Coalfield  Coal India Limited  Detailed coal exploration in Haripur Chaparia Block, Rajmahal Coalfield, District - Dumka, Approximate area of block 10.45 Sq.Km., Anticipated Meterage 40000 m. Work order issued on 02.04.2015. 12.7
19 TALABIRA II & III OCP - 23 MTPA  Neyveli Lignite Corporation  Talabira Coal Block was allotted to NLC India Ltd. for the 2 Joint Venture projects : 1. Neyveli Uttar Pradesh Power Limited (NUPPL) at Ghatampur (JV with UPRVUNL) & 2. NLC Tamil Nadu Power Ltd (NTPL)in Tamil Nadu (JV with TANGEDCO) 2401.07
20 NEYVELI NEW THERMAL POWER PROJECT - 1000 MW  Neyveli Lignite Corporation  The existing Thermal Power Station TPS-I of 600 MW is continuously in operation since 1961 and it has been decided to phase out the operation of the Units and to set up a 1000 MW Thermal Power Plant at Neyveli viz. Neyveli New Thermal Power Station (NNTPS) in its place. The project has been sanctioned by GoI. Order has been placed for Steam Generator and Auxiliaries and Turbine Generator and Auxiliaries packages on M/s BHEL. 7080.41
21 Dumri Coal Mine  MOC/NA  The Dumri coal mine has been allocated to M/s Hindalco Industries Ltd vide Vesting order 104/24/2015/NA dated 22.04.2015 in accordance with the provisions of Coal Mines (Special Provisions) Act 2015, and the rules framed there under. The project is located in Hazaribag District of Jharkhand. The mine was auctioned as Schedule III mines having FC stage I and EC already granted to the prior allotee of the Coal Block. 110
22 Doubling of Ramna-Singrauli, Billi-Chopan and Karela Road-Shakti Nagar Rail lines  Coal India Limited  Railway has taken up doubling of Ramna-Singrauli, Billi-Chopan and Karela Road-Shakti Nagar Rail lines with scheduled completion of 2019-20, 2018-19 and 2018-19 respectively. Doubling of these lines is required for target coal dispatch to upcountry power plants from NCL from 2018-19.
23 Durgapur Extn. Deep OC  Coal India Limited  Brown Field Opencast Project, Reserve - 47.27 Million Te., Sanction Date - 02/02/17, EC for Phase II (with Forest land) under consideration at MoEF,Grade of Coal - G10, Stripping Ratio - 6.58, Life of Project - 17 years. 378.87
24 Kerandari  MOC/NA  NTPC the allocatee of Kerandari block has received approval of mining plan & mine closure plan from MOC, Stage I Forest Clearance and Environment Clearance from MOEF&CC, Consent to Establish from SPCB. Land acquisition and MDO appointment are under progress. 1300
25 Naini Coal Mine  The Singareni Collieries Company Limited  Naini coal mine is allocated to M/s SCCL by MoC, GoI vide order No.103/21/2015/NA, dated 13.08.2015 with time-lines for consistent supply of coal to STPP. This is green field Project. The coal block is located in Angul District of Odisha State
26 TALABIRA II & III COAL BLOCK  Neyveli Lignite Corporation  TALABIRA II & III COAL BLOCK was allocated to NLC India Limited for the Joint Venture projects : 1. Neyveli Uttar Pradesh Power Limited, a Joint Venture between NLC India Limited and UPRVUNL, located in Ghatampur Tehsil, Kanpur Nagar Dist, Uttar Pradesh & 2. NLC Tamil Nadu Power Limited,a Joint Venture between NLC India Limited and TANGEDCO, in Tamil Nadu. 2467.58
27 PACHWARA SOUTH COAL BLOCK  Neyveli Lignite Corporation  Ministry of Coal (MoC), Govt. of India has allocated Pachwara South Coal Block (PSCB) which is having the total coal reserve of 305 MT in the State of Jharkhand to Neyveli Uttar Pradesh Power Ltd (NUPPL) to cater the coal requirement of 1980 MW coal based Super Critical NUPPL Project, on 25.07.2013. 2095.09
28 Suliyari Coal Mine  MOC/NA  The Suliyari Coal Mine is located at about 75 km south-west of Singrauli Township, the district Headquarter, where as it is 45 km south-west of Waidhan Township, the Tehsil Headquarter. Suliyari Coal Mine is re-allotted to APMDC Ltd under dispensation scheme. The total geological reserves estimated in the block are 142.091 Million tonnes (Mt) upto a depth of 350m of V seam.
29 Neyveli Uttar Pradesh Power Project Limited  Neyveli Lignite Corporation  3X660 MW Thermal Power Plant in Ghatampur Tehsil of Kanpur Nagar, District, in Joint Venture between NLC and UP Rajya Vidyut Utapadan Nigam Ltd. GoI sanctioned the project vide Order No. 43011/2008-CPAM dated 27.07.2016. 17237.8
30 MADANNAGAR OC PROJECT  Coal India Limited  Madannagar OC is a Greenfield project. PR approved in Oct. 2015 by CIL Board.The capacity is 12 MTY. 1875.32
31 MALACHUA OC PROJECT  Coal India Limited  Malachua OC is a Greenfield project. PR approved in Oct. 2015 by SECL Board.The capacity is 3 MTY. 488.33
32 5.0 MTPA patherdih nlw washery  Coal India Limited  With a view to supply improved quality and sized coal to the consumers , BCCL Board had sanctioned construction of this washery in Feb,2011.The capacity is 5 MTY. 269.82
33 Development of Railway Siding for dispatch of washed coal of Integrated Lakhanpur-Belpahar-Lilari OCP at IB-Coalfields of MCL.  Coal India Limited  Project Area : Lakhanpur Area The entire Project is divided into two phases : Phase-I : 10 MTPY Route Length : 2 KM Track Length : 8.06 KM Project Cost : Rs.62.89 Crs. M/s RITES Ltd. has been engaged for preparation of Feasibility Study Report and Detailed Project Report. Phase-II : 20 MTPY Phase-II will be taken up after completion of Phase-I 161.11
34 Rail Connectivity of Lingaraj SILO with Talcher mainline and NTPC captive line and its Doubling at Talcher Coalfields of MCL.  Coal India Limited  Project Area : Lingaraj Area Route Length : 2.1 KM Track Length : 8 KM Executing Agency : RITES Ltd. 178.95
35 Rail connectivity of Lingaraj SILO with existing Deulbeda Siding at Talcher Coalfields of MCL  Coal India Limited  Project Area : Lingaraj Area Total Track Length : 3.6 KM. Executing Agency : East Coast Railway 43
36 Jharsuguda-Barpali-Sardega Rail Link at IB Coal Field of MCL in Odisha.  Coal India Limited  Total Length : i)52.412 Km upto Barpali with Barpali Bulb ii) 50.30 Km upto Sardega without Loading Bulb No. Of Station : 05 nos Executing Agency : South Eastern Railway, Kolkata It will serve Kulda, Garjanbahal, Siarmal and Basundhara (West) OCPs. 1044
37 Railway line from Bhadrachalam to Satuupalli(53.20Km)  The Singareni Collieries Company Limited  Railway line from Bhadrachalam Road to Sattupalli is proposed to transport the coal from 4 No of SCCL mines namely JVR OC I (4.00MT), JVR OC II (10.00 MT), JVR OC III (4.00 MT) and Kistaram OC (2.00 MT) and to comply the EC condition which reads as “No coal transportation shall be undertaken by road”. Total length of the railway line is 53.20 km. Period of construction is 3 year. Railway line was sanctioned in Railway budget in 2010-11. 360
38 2.5 MTPA Dugda NLW Washery-Rail Siding  Coal India Limited  Renovation and modification of existing Railway Siding at Dugda Coal Washery of BCCL. -Track Length 17.5 Km. 77.82
39 1.6 MTPA Dahibari NLW Washery- Rail Siding  Coal India Limited  Renovation/Strengthening of Existing Railway Siding at Dahibari of CV Area. Track length- 6.20 Km. 45.3997
40 2.0 MTPA, Bhojudih NLW Washery-Rail Siding  Coal India Limited  Renovation/Strengthening of existing Railway Siding at Bhojudih Washery for 2.0 MTPA Project. Track Length- 5.76 Km. 62.17
41 PR siding connecting to Silo of Block-B OCP  Coal India Limited  PR siding 6.39 km connecting Silo of Block-B OCP to Katni-Chopan Railway line of EC Railway is to be constructed for dispatch of coal from Block-B OCP. 48.81
42 PR line connecting to Silo of Krishanshila OCP  Coal India Limited  906 m length of PR line connecting to Silo of Krishnashila CHP (under construction) is to be constructed for dispatch of coal from Krishnashila by Railway in addition to the dispatch to linked consumer by Belt-pipe conveyor. 20.5
43 KBJ line diversion for accommodation of infrastructure & Dump of Khadia Expansion OCP (4 to 10 Mty)  Coal India Limited  Part of KBJ section 3.7 Km, branching from Chopan-Katni Railway line of EC Railway is to be diverted for accommodation of infrastructure and OB Dump of Khadia Expansion OCP (4 to 10 Mty). 31.28
44 Amlohri Railway Siding via Nigahi as per Project Report of Amlohri/Nigahi Expansion OCP  Coal India Limited  Extension of PR line 5.8 km. from Jayant to Amlohri connecting Silo of Nigahi and Amlohri Expansion OCPs for dispatch of coal by railway in addition to MGR of linked TPPs 64.57
45 Manikpur Rail Under Bridge (RUB)  Coal India Limited  Project work is for construction of RUB for facilitating OB removal from eastern query to western query of Manikpur OC through RITES as per MoU between CIL & RITES 40
46 Batura Siding  Coal India Limited  Project work is for construction of Rail infrastructure for Batura group of mines through RITES as per MoU between CIL & RITES. Total length starting from Anuppur station is 16.50 km. This siding will handle approximately 5 MT coal per annum of three mines namely, Rampur Batura OC, Batura West OC and Batura Highwall of Sohagpur Area 104.29
47 Kusmunda Siding  Coal India Limited  Project work is under Project Management Consultancy through RITES as per MoU between CIL & RITES. Approximately 40 MT coal of Kusmunda OCP will be handled through this siding. Length of siding is 3.1 km and total length of track is 24 km. 221.78
48 Konar Railway Siding  Coal India Limited  Konar Railway Siding is proposed for dispatch of coal from Konar OCP. The siding is to take off nearby Jarangdih Railway Station level crossing and is to be constructed between Bokaro Thermal Power Station (BTPS) and Jarangdih Station. Route length of the Siding is 2.3 KM (Approx). 15.91
49 North Urimari Railway Siding  Coal India Limited  North Urimari Railway Siding is proposed for dispatch of coal from Urimari OCP. The siding is to take off from Patratu Station. Route length of the Siding is 10.8 KM and total track length is 19.5 KM. 201.57
50 Amrapali Railway Siding  Coal India Limited  Amrapali Railway Siding is proposed for dispatch of coal from Amrapali OCP. The siding is to take off from Manatu Station on Tori-Shivpur Rail Line. Route length of the Siding is 15.6 KM and total track length is 29.3 KM. 374.89
51 Magadh Railway Siding  Coal India Limited  Magadh Railway Siding is proposed for dispatch of coal from Magadh OCP. The siding is to take off from Bukru Station on Tori-Shivpur Rail Line. Route length of the Siding is 14.6 KM and total track length is 28.35 KM. 391.09
52 Rail infrastructure/ Railway siding at Sonepur Bazari Comb. OCP  Coal India Limited  This railway project intents to handle loading & dispatch of projected production of coal from Sonepur Bazari Comb. OCP. M/S RITES has been engaged as consultant & supervisor as per MOU with CIL. The entire cost of the project is to be borne by ECL within overall capital of Sonepur Bazari Comb. OC “ongoing” coal project. It involves construction of rail line of about 6.5 km (route length) with total track lying of 17.1 km. The alignment of the proposed siding has been planned with “Y” connection to provide entry & exit from both Pandaveswar as well as Andal end. In the loading terminal two separate loading SILO have been provided connecting the pre-loading & post-loading lines for simultaneous loading of two rakes. However, as per latest decision, proposal for construction of SILO is to be replaced with two nos of 500T surge hoppers with rapid loading system. A full length wharf-wall siding is also being constructed (at Chainage 4 Km) from where coal will dispatched through this rail infrastructure. 108.15
53 Gare Pelma Sector-III Coal Block  MOC/NA  The MoC Govt of India vide letter No 103/23/2015/NA dtd 24.03.2015 allotted the GP-III coal block in Dist. Raigarh to CSPGCL. The earlier allottee was GoaIDC. The FC and EC has been issued by MoEF which is in the name of GOAIDC CSPGCL have applied to MoEF through NoM Authority, MoC for transfer of FC and EC clearances from M/s GIDC to CSPGCL. 704
54 Gare Palma IV/4 Coal Mine  MOC/NA  Subsequent to de-allocation of coal blocks by Hon’ble Supreme Court of India in 2014, auction of this coal blocks was conducted by Nominated Authority appointed by the Ministry of Coal (GOI), New Delhi. Post Bidding, Gare Palma- IV/4 Coal block, has been allocated to M/s Hindalco Industries Limited (HIL) and Ministry of Coal issued a vesting order no. 104/16/2015/NA dated 23rd March 2015 in favour HIL. 370
55 Rohini OC  Coal India Limited  It is a Brown field coal mining project having capacity of 2.0 / 2.3 MTY. Capacity to be expanded to 3.0 / 3.3 MTY. The project is in Ranchi district
56 Jharkhand OC  Coal India Limited  It is an expansion in capacity of Jharkhand OC from 1 MTY to 2 MTY / 2.7 MTY.
57 Koyagudem OC II Project  The Singareni Collieries Company Limited  Koyagudem OC II Project is a completed project. Stage II clearance of forest land(231.84 HA) is required
58 Ghonsa OC  Coal India Limited  This is an existing Project. EC is required for additional land (including Forest land for which Stage - I FC has been secured). Capacity of the Project shall remain the same.
59 Nehariya UG Expn.  Coal India Limited  This is an Expansion of existing Underground mine with increased mechanization for enhancement of capacity from 0.36 MTY to 0.54 MTY
60 New Sethia Expansion OC  Coal India Limited  This is a brown field Project and is an expansion of New Sethia OC (Cap. 0.2 MTY), to mine out lower group of seam in the existing Area with ehancement in capacity from 0.2 to 0.5 MTY.
61 Parsa Coal Mine  MOC/NA  Proposed project is for mining of coal for Chhabra TPP, Kalisindh TPP & Suratgarh Supercritical TPP of Rajasthan Rajya Vidyut Utpadan Nigam Limited. Lease area is 12.52 Sq. Km. (1252.447 ha) and it is proposed to produce of 5 MTPA.
62 ARDHAGRAM COAL MINE  MOC/NA  THE ARDHAGRAM COAL MINE WAS VESTED TO M/S OCL IRON AND STEEL FOR THEIR CAPATIVE PLATN
63 Majra Coal Mine  MOC/NA  M/S Jaypee Cement Corporation Limited (JCCL) has been declared successful bidder for allocation of Majra Coal Mine for captive use of its coal in Cement Plan/ CPP. The vesting order (Ref No.:104/34/2015/NA dt. 30th September, 2015) has been issued to JCCL by Nominated Authrity (Ministry of Coal). 200
64 Marki Mangli -III Coal Mine  MOC/NA  Marki Mangli -III Coal has been successfully Vested on 14th April 2015 to M/s B S Ispat Ltd vide Vesting order No.104/6/2015/NA for 2x100 TPD Sponge Iron Plant and 11 MW Captive Power Plant. The Capacity of the Mine is 0.21 MTPA as per approved Mining Plan from Ministry of Coal.
65 Parsa East and Kanta Basan Coal Block  MOC/NA  Proposed project is for mining of coal for Chhabra TPP, Kalisindh TPP & Suratgarh Supercritical TPP of Rajasthan Rajya Vidyut Utpadan Nigam Limited.
66 BARJORA(NORTH) COAL MINE  MOC/NA  Barjora (North) Coal Mine which was previously held by M/s DVC Emta Coal Mines Limited, was under operation and mining activity was going on till its de-allocation by the order of Hon’ble Supreme Court of India in September,2014. Nominated Authority, Ministry of Coal(MoC), Govt. of India, conducted the allotment process of the de-allocated coal mines under schedule I as per the provisions of the Coal Mines (Special Provisions) , Second Ordinance ,2014 and the Coal Mines (Special Provisions) Rules 2014 and allotted the Barjora (North) Coal Mine to The West Bengal Power Development Corporation Limited(WBPDCL) vide Order No. 103/7/2015 /NA dated 31.03.2015.Hence from 00:00 hours of 01.04.2015, WBPDCL became the owner of the mine. The Barjora (North) coal mine in Barjora Coal field lies between latitudes 23° 25’ 55’’N and 23° 27’ 42’’N and Longitudes 87° 13’ 48’’E and 87° 15’ 36’’E and falls within the administrative jurisdiction of Barjora Police Station in the Bankura district of West Bengal. The area is covered by the survey of India Topo Sheet No. 73M/3 and 73M/7 on R.F.1:50,000. The nearest Railway station from Barjora Coal field is Durgapur at a distance of about 30 Km, located on the Howrah-Delhi Main line of Eastern Railway. Barjora block is connected to Durgapur by a metal road via Durgapur Barrage. An all-weather metalled road connecting Barjora (lying on the Durgapur-Bankura Highway) and Saltora passes almost along the North-Eastern boundary of the Barjora coal field. Barjora North Open Cast Coal Mine has a Quarry Excavation Area of 663 Ha, total Project Area 927.5 Ha and 336.4 Ha of forest land needs to be diverted. 385.15
67 UTKAL D & E  MOC/NA  Utkal D & E coal mines has been allotted to NALCO on 02.05.2016. For Utkal D coal mine many statutory clearances are already available. NALCO has got the permission from MoC to develop Utkal D in Phase I and Utkal D and E combined in Phase II. However the statutory clearances in respect of Utkal D may be transferred in Favour of NALCO for the same. 533
68 SITANALA COAL MINE  MOC/NA  Sitanala Coking Coal Block is a 0.3MT underground project working with Manual longwall with stowing (Jankowice Method).
69 Brinda and Sasai Coal Mine  MOC/NA  Brinda & Sasai is located in the northern part of the North Karanpura Coalfield and falls within the administrative jurisdiction of Chatra and Hazaribag districts of jharkhand state.The total leasehold area is 1377.62 Ha. 303.15
70 Dumri Coal Mine  MOC/NA  Dumri Coal mine is located in villages of Balia, Pagar, Tunda and Pandu under Keredari revenue Anchal of Hazaribag district in the state of Jharkhand. The coal mine was earmarked for non-regulated sector in the recently concluded coal block auction by Ministry of Coal, Government of India. Prior to the coal block auction, the coal mine was allocated to M/s Nilachal Iron & Power Ltd (NIPL) and M/s Bajrang Ispat (P) Ltd. The Mine has now been vested with Hindalco Industries Ltd vide vesting order no. 104/24/2015/NA dated 22nd April 2015. As per CMPDA, the mine is supposed to be in production from Dec 2018. 200
71 Parbatpur Central Coal Mine  MOC/NA  The project was allotted to Steel Authority of India Limited on 23.03.2016 by MoC, GOI.The project consist of an opencast and an underground mine of total planned production as per approved Mine Plan is 1.24MT.
72 PVK 5 INCLINE  The Singareni Collieries Company Limited  PVK 5 INCLINE : Location: Khammam District Telangana State. Linkage: Basket Linkage. This is Brown field project. 114.7
73 Detailed coal exploration in Rajbar A Block, Auranga Coalfield  Coal India Limited  Detailed coal exploration in Rajbar A Block, Auranga Coalfield, District - Latehar, Approximate area of block 15.74 Sq.Km., Approximate Forest area in the block 1.07 Sq.Km. Anticipated Meterage 46100 m. Work order issued on 15.01.2016. 41.49
74 Detailed coal exploration in Rajbar C (Eastern Part) Block, Auranga Coalfield  Coal India Limited  Detailed coal exploration in Rajbar C (Eastern Part) Block, Auranga Coalfield, District - Latehar, Approximate area of block 8.8 Sq.Km., Approximate Forest area in the block 7.09 Sq.Km. Anticipated Meterage 22000 m. Work order issued on 30.11.2015. 19.8
75 Land Acquisition for Mine 1 and Mine 1A  Neyveli Lignite Corporation  Land acquisition pending for the running Mines commissioned already for mine advancement.
76 KETKI UG MINE  Coal India Limited  Ketki UG is an ongoing project of SECL. Production capacity 0.42 MTY. EC exists for 0.42 MTY. Captal outley Rs 46.24 Crores. Linkage will be to misc. consumers. 46.24
77 Neyveli New Thermal Power Project (2 x 500 MW)  Neyveli Lignite Corporation  The existing TPS-I of 600 MW capacity at Neyveli is continuously in operation since 1961 and it has been decided to phase out the operation of the Units and to set up a 1000 MW Thermal Power Plant at Neyveli viz. Neyveli New Thermal Power Station (NNTPS) in its place. The proposal to implement the NNTPS project has been sanctioned by GoI and the project activities have commenced. Order has been placed on M/s BHEL for Steam Generator & Auxiliaries(NTA 1) Package and Turbine Generator Package (NTA 2). 5907.11
78 Expansion of Lignite Mine-1 (Lease area) and Expansion of Lignite Mine 1A (3.0 to 7.0 MTPA)  Neyveli Lignite Corporation  The proposal to implement the NNTPS project has been sanctioned by GoI and the project activities have commenced. The present proposal for expansion of Mine-I (Lease Area) and Mine-IA (3.0 MTPA 7.0 MTPA) is to feed NNTPS of higher capacity, besides to cater to the existing supply to TPS-I Expansion and to ST-CMS, the IPP. The reserves of Mine-I is proposed to be increased by annexing two blocks (H&I) located at the west of the existing Mine-I while the reserves in Mine-IA is proposed to be increased on the western side below the outside dump area and also annexing the areas on the eastern and north eastern sides of existing Mine-IA. The reserves available in Mine-I may not be sufficient to meet the fuel requirement for the balance life of TPS-I Expansion and NNTPS for the next 25 years and the shortfall will be met out of the surplus lignite available from Mine-IA. 1458.17
79 Adriyala Shaft Project  The Singareni Collieries Company Limited  Adriyala Shaft Project was approved by GoI with a rated capacity of 2.81 MT and sanctioned cost of Rs 1228.39 Crores. 1228.39
80 DURGAPUR OC  Coal India Limited  Durgapur OC is an ongoing project. PR approved in Feb. 2015.The capacity of the project is 6 MTY. 916.24
81 MANIKPUR OC EXPN  Coal India Limited  Manikpur OC Expn is an ongoing project. Project Report approved in Dec. 2009. 321.5
82 Hingula Washery  Coal India Limited  Hingula washery project, with a capacity of 10 Mtpa, will be located at Balaram Opencast Project in Hingula Area with raw coal linkage from Hingula Opencast mine under Build-Operate-Maintain (BOM) concept. The washery is designed to produce two products viz. clean coal with target ash (monthly average) content of 33.5% & rejects. 321.96
83 IB-Valley Washery at Lakhanpur  Coal India Limited  Ib-Valley coal washery project, proposed to be setup under 1st Phase, will be located in Lakhanpur Area with raw coal linkage from Integrated Lakhanpur-Belpahar-Lilari OCP on Build-Operate-Maintain (BOM) concept. The throughput capacity of the washery will be 10 Mtpa of raw coal. The washery will be designed to produce two products viz. clean coal with target ash (monthly average) content of 33.5% & rejects. 336.9
84 Jagannath Washery  Coal India Limited  Jagannath washery project, with a capacity of 10 Mtpa has been planned at the Pit head of Bhubaneshwari OCP in Jagannath Area, with raw coal linkage from Bhubaneswari Opencast mine. This is planned to wash non-coking coal under Build-Operate-Maintain (BOM) concept. The washery is designed to produce two products viz. clean coal with target ash (monthly average) content of 33.5% & rejects. 265.35
85 Basundhara Washery  Coal India Limited  Basundhara coal washery project with a capacity of 10 Mtpa is proposed to be set up under 1st Phase, which will be located in Kulda OCP with raw coal linkage from the Kulda OC of Basundhara Area. This is planned to wash non-coking coal under Build-Operate-Maintain (BOM) concept. The washery will be designed to produce two products viz. clean coal with target ash (monthly average) content of 33.5% & rejects. 334.72
86 Brinda and Sasai Coal Mine  MOC/NA  Brinda and sasai are contiguous coal blocks are located in the northern part of north karanpura coal fields and mainly falls in the chatra district and partly in Hazaribag district of Jharkhand. Block is fully explored by CMPDI and planned to operate partly by opencast and partly by underground method. A river named Barki flows by the east require to be diverted from the area. 303.15
87 Karo Washery  Coal India Limited  Karo washery is a non coking coal washery, linked to Karo OC. It will be constructed under BOM concept.
88 Shankarpur OCP (Phase IV)  Coal India Limited  Shankerpur OC Phase-IV Project of Capacity: 0.80 Mty, (life: 6 years) lies in Kenda Area of ECL in Burdwan Distt. This was approved on 12-09-14. 9.59
89 Bhanora West OC Patch  Coal India Limited  Bhanora OC Patch Project of Capacity: 0.50 Mty, (life: 6 years) lies in Sripur Area of ECL in Burdwan Distt. 17.89
90 Konar washery  Coal India Limited  Konar washery has a capacity of 7 MTY. It will be constructed using BOM concept.
91 Bansara OC Patch  Coal India Limited  Bansara OC Patch Project of Capacity: 0.50 Mty, (life: 5 years) lies in Kunustoria Area of ECL in Burdwan Distt. The patch falls within the Bansara Deep Geological Block. Mine is located 20 Km east of Asansol. The scheme was approved by ECL Board on 20.12.2013 17.84
92 Dabor Ph-III OC  Coal India Limited  Dabor Phase-III OC Patch Project of Capacity: 1.50 Mty, (life: 7 years) lies in Salanpur Area of ECL in Burdwan Distt. This was approved on 28-07-14. Coal dispatch is linked with ECLs basket of coal.   18.17
93 SPV FOR RAIL INFRASTRUCTURE OF MCL  Coal India Limited  Joint Venture Company of MCL, IRCON & IDCO(Odisha) named Mahanadi Coal Railway Limited has been formed to create Rail Infrastructures in the State of Odisha.
94 Jharkhand OC  Coal India Limited  It is a completed project. 110.89
95 HALDIBARI UG (0.42 MTY)  Coal India Limited  Is an underground ongoing project. PR approved on 15.10.2003. Coal production started in Oct 2010. 47.59
96 Kumardhubi UG , Barmuri OC & Rajpura OC under cluster -2  Coal India Limited  Projects/mines Kumardhubi UG(0.1 MTY), Barmuri OC(0.5 MTY) & Rajpura OC(0.5 MTY) under EC cluster -2 located in Dhanbad dist of Jharkhand
97 MOITRA COAL MINE  MOC/NA  Moitra Coal Mine is a green field project, with lease area of 293.54 Hectares with approved Mining plan of 1.0 Mtpa.
98 Restructuring of Mine-I and Expansion of Mine-IA  Neyveli Lignite Corporation  The project proposal is for Restructuring of Mine-I and Expansion of Mine-IA. As suggested by EAC, Mine-I capacity will be maintained at 10.50 MTPA. Mine-IA will be expanded from 3.0 to 7.0 MTPA. At present, Mine-I caters the fuel need of TPS-I (600 MW) and TPS-I Expansion (420 MW). Mine-IA caters the fuel need of TAQA (250 MW – IPP) and for higher PLF operation of NLC Power plants. The above proposal is for meeting fuel requirement of Neyveli New Thermal Power Station (NNTPS) (1000 MW) which is under construction. TPS-I (600MW)will be withdrawn in stages oncommissioning of NNTPS – 1000 MW 1458.17
99 Tikak OCP  Coal India Limited  The project is an existing mine under operation from 1982, based on the project report prepared by CMPDIL in 1978 called Baragolai Hill Top OCP, with a total mineable reserve of 8.166 MT. Environment Clearance for 0.2 MT was approved in 1995. The project falls within 4 sq. mile mining lease and Namdang coal grant vested with Coal India from Nationalization Act.The project has applied for renewal of forestry clearance for 98.59 Ha for life up to 2023. 12
100 Tipong OCP  Coal India Limited  Date of sanction 13-05-2011 Sanctioned Mine Capacity 1.00 MTY Sanctioned Capital Rs.260.15 Cr. (Outsourcing) Rs.683.27 Cr (Departmental) Mineable Reserve 19.03 MT Life 25 years Average Stripping Ratio 15.77 Cum/T Land 783.69 Ha (Forest) Scheduled date of completion 6th Yr. Anticipated date of completion-under Clearance Stage 1st year of production as per PR 4th Yr. of achieving targeted production 6th Yr. Actual date of production Not yet started. Previous UG working exists. Forestry Clearance applied. 260.15