Showing Record(s) 1 to 100 of Total 390 Green Box -Projects where all Issues are resolved
S.No Project Name Agency-Department Description Of Projects
(As furnished by the applicant)
Estimated Investment(in Crores)
1 Gevra CHP: Load Out System  Coal India Limited  Rapid Rail Load Out System includes 500 Te capacity Surge Hopper and 100 Te capacity Pre-weigh Bin, Truck Receiving Station for receiving coal from trucks, 30000 Te capacity RCC overhead Bunker and associated belt conveyors for reclamation of coal, feeding coal to the bunker and subsequently feeding it to the Rapid Rail Load Out System with all allied works for loading of coal into Railway wagons at Gevra OC Expansion (35-70 MTY) Project.
2 FIRST MILE CONNECTIVITY OF MCL  Coal India Limited  Coal Evacuation Plan through RLS/SILO and elimination of Wharf Wall loading in MCL as per the First Mile Connectivity Programme
3 First Mile Connectivity  Coal India Limited  (100 days programme)Approval of PR for Dinesh (MKD III) Expn. OC is a part of First Mile Connectivity Proogramme of MoC.
4 Construction of additinal CHP with SILO at Rajmahal OC  Coal India Limited  An additional CHP with SILO having capacity to handle 10 MTPA of Coal has been conceived to handle and load directly into wagons of MGR system of NTPC above and above the capacity of existing CHP.
5 JVR OC II CHP  The Singareni Collieries Company Limited  Construction of CHP under EPC mode.
6 SRP OC CHP  The Singareni Collieries Company Limited  Construction of CHP for supply of Coal to STPP.
7 First Mile Connectivity of Pirpainti Barahat OCP - 100 Days Program  Coal India Limited  The Project is a part of 100 DAYS PROGRAM of the Government to be implemented by BCCL to achieve despatch of 0.50 MT coal by rail through SILO in 2023-24
8 1st Mile Connectivity Project_Dudhichua Expansion CHP  Coal India Limited  Incremental 10 Mtpa CHP is part of Dudhichua Expansion OCP. Involves Crushing, Conveying by belt conveyor system, Storage and loading of Rail/MGR wagons through RLS of Silo 500.9
9 1st mile connectivity project_Jayant Expansion CHP  Coal India Limited  Incremental 15 Mtpa CHP is part of Jayant Expansion OCP. Involves Crushing, Conveying by belt conveyor system, Storage and loading of Rail/MGR wagons through RLS of Silo 680
10 1st Mile Connectivity Project_Krishnashila CHP  Coal India Limited  Costruction of CHP for Krishnashila OCP is part of the Krishnashila OCP (4 Mtpa) 176
11 Kotre Basantpur Pachmo OCP  Coal India Limited  It is a greenfield coal mining project with capacity of 5 MTY, located in the districts of Ramgarh & Bokaro.
12 Kusmunda CHP Phase-II  Coal India Limited  Kusmunda CHP Phase-II includes construction of four number Silos each of 4000 te capacity with Rapid Loading Systems, Elevating Belt Conveyors for the Silos and Truck Receiving Station for receiving coal from the trucks and feeding it to the elevating conveyors of the Silos for loading of Raw Coal/ Washed Coal into Rail Wagons at Kusmunda OC. 262.75
13 Kusmunda CHP Phase-I  Coal India Limited  Commissioning of Kusmunda CHP Phase-I is a part of 100 days programme of MoC. This includes (A) Construction of 20,000 Te RCC Bunker along with its feeding arrangement to dispatch coal to Chhattisgarh State Power Generation Company Limited (CSPGCL) at Kusmunda OCP by SECL, which is already completed (B) Construction of Belt Conveyor from 20,000 Te RCC Bunker to Chhattisgarh State Power Generation Company Limited (CSPGCL) plant by CSPGCL, which is under construction. 89.97
14 Moonidh 2.5 MT Washery  Coal India Limited  To wash coal from Moonidih XV Seam for supply to steel plants
15 New CHP with SILO (12 MTPA) at Sonepur Bazari OCP  Coal India Limited  The proposed CHP is designed to handle the entire coal production of Sonpur Bazari OC Project. Coal will be conveyed through Belt Conveyor to ground bunker and reclaimed from ground bunker to 4000 Te SILO. From SILO grade wise coal will be loaded into wagons by Rapid Loading System. Two nos of Pre-weigh hoppers shall be fitted underneath each SILO for accurate weighment of the wagons loaded 180.87
16 2.5 Mtpa Dugda NLW Washery  Coal India Limited  To Supply washed coal of Ash percentage of 19% to Steel plants and power coal to Power utility.
17 2.0 Mtpa Bhojudih NLW Washery  Coal India Limited  To Supply washed coal of Ash percentage of 19% to Steel plants and power coal to Power utility. 304.13
18 2.5 Mtpa Patherdih NLW Washery  Coal India Limited  To Supply washed coal of Ash percentage of 19% to Steel plants and power coal to Power utility. 281.91
19 Tadicherla-1 Coal Mine  MOC/NA  Tadicherla-1 Coal Mine is allotted to TSGENCO to meet the coal requirement of Kakatiya Thermal Power Project.coal production started in April,2018. 1944.9
20 BAROUD WASHERY  Coal India Limited  Baroud Washery is proposed to be set up to wash raw coal from Baroud OC, Jampali OC and/or other nearby mines to produce power grade (less than 34% ash) coal to be supplied to power plants as per the stipulations of MOEF.
21 New Kathara Washery  Coal India Limited  It is a Coking Coal Washery with proposed capacity of 3 MTY.
22 Ashok Non-coking Coal Washery  Coal India Limited  It is a Non-Coking Coal Washery with proposed capacity of 4 MTY
23 Penagadapa Coal Block  The Singareni Collieries Company Limited  The Ministry of Coal, GoI has allotted the Penagadapa Coal Block to M/s Singareni Collieries Company Limited vide Allotment order F.No.103/7/2016/NA, Dated:15th Dec 2016.
24 Kathautia Open Cast Coal Project  MOC/NA  Kathautia Open Cast Coal Mine is having capacity to produce 0.80 MTPA. Earlier it was allotted to USHA MARTIN Ltd. The mine was vested to Hindalco Industries Ltd on 2015 by e-auction. In FY 2017-2018 Hindalco achieved 0.80 Million Tonnes production. In FY 2018-19 It achieved 0.798. Presently is running with full capacity. 360
25 Dumri Coal Mine  MOC/NA  Dumri Coal Mine, located in villages of Balia, Pagar, Tunda and Pandu under Keredari revenue Anchal of Hazaribag district in Jharkhand State.Dumri coal mine was allocated to M/s Nilachal Iron & Power Ltd (NIPL) and M/s Bajrang Ispat (P) Ltd.& vested to M/s Hidnalco through E-auction by the Ministry of Coal, GoI, in 2015 and subsequently the Nominated Authority, MoC, Govt. of India issued Vesting Order in favour of M/s Hindalco Industries Limited vide Order no.104/24/2015/NA. Dated 22-04-2015. The Mine auctioned in the Schedule III category Mines . EC and FC stage I was already granted to the Prior Allotee & prior allotee had also purchased and mutated 409 acres of non-forest private land for transfer as compensatory afforestation purpose to Forest Dept. for getting stage II FC. The Mine is planned for opening by 22nd Dec 2018 as per the CMPDA signed for getting the vesting order of the Mine. Unfortunately, Entire 409 acres CA land which was purchased by prior allottee to be cancelled by the State Govt. after that we have arranged and purchased fresh 159.64 Ha Non-Forest CA Land ,and that have been mutated in favor of Environment Forest and Climate Change, Goj , Ranchi. 235.712
26 Suliyari Coal Mine  MOC/NA  Suliyari Coal project is having extent of 1298Ha out of which 260Ha is forest land.The targeted capacity of Mine is 5mtpa.The life of the mine is 25Yrs.
27 Madanpur South Coal Mine  MOC/NA  Madanpur south coal mine is having an extent of 712.072Ha and out that 90 percent is forest land.Around 90pdfs are present in project affected villages.The targetted coal production is 5.4Mtpa.The scheduled date of production is May 2020.
28 Meral Coal Mine  MOC/NA  Meral Open Cast Coal Mine Project is allocated to M/S Trimula Industries Limited in District-Palamau in Jharkhand State via coal block auction process conducted by the Ministry of Coal, New Delhi vide vesting order no.104/23/2015/NA,dated-April 22,2015.Environment Clearance already granted to the prior allottee of the block.. To expedite the development process, we seek acceptance to the Project Monitoring Group. Development of Meral would need support and assistance from various departments like Mines and Geology, Revenue and Land Reforms, Water Resources, Forest and Environments, etc. 300
29 NERAD MALEGAON  MOC/NA  Indrajit Power Private Limited has been vested with Nerad Malegaon Coal mine, schedule III Coal Mine. The mine operation is by opencast and underground method. The total Mining Lease area is of 450ha which covers 4 villages namely Nerad, Malegaon, Hiwardhara and Sindhiwadona of Wani and Zari Jamni Taluka of Yavatmal district of Maharashtra State and the land is mostly in the form of private land. The total Geological Reserves is 20.36MT. The Capacity of Mine is 0.36MT (0.15MT opencast and 0.21MT Underground). Mining plan and EC has been transferred in the name of Indrajit Power Private Limited. Mine Closure Plan has also been approved. IPPL has also vested 61.92 Ha of land at the time of vesting order. Mining lease deed of Nerad Malegaon Coal Mine has been executed in the name of Indrajit Power Private limited. Presently acquisition of Minimum Land required for Mine opening permission is under process. 85.71
30 Baitarni-West coal mine  MOC/NA  It is a green-field project. Land acquisition has been made through CBA Act 1957. Section 3, 4(i) and 7(i) notification have already been made. 3100
31 Gourangdih ABC Coal Mine  MOC/NA  Gourangdih ABC Coal Block has been allocated by MoC, GoI. The Gourangdih ABC Coal Block is located at a distance of about 20 kms to the north of Asansol in the Paschim Bardhaman District of WB. The Block comprises of 3 Sectors namely A, B & C. 621
32 Expansion of Mine-1 (Lease area) and Mine 1A (3.0 to 7.0 MTPA)  Neyveli Lignite Corporation  The proposal to implement the NNTPS project has been sanctioned by GoI and the project activities have commenced. The present proposal for expansion of Mine-I (Lease Area) and Mine-IA (3.0 MTPA 7.0 MTPA) is to feed NNTPS of higher capacity, besides to cater to the existing supply to TPS-I Expansion and to ST-CMS, the IPP. The reserves of Mine-I is proposed to be increased by annexing two blocks (H&I) located at the west of the existing Mine-I while the reserves in Mine-IA is proposed to be increased on the western side below the outside dump area and also annexing the areas on the eastern and north eastern sides of existing Mine-IA. The reserves available in Mine-I may not be sufficient to meet the fuel requirement for the balance life of TPS-I Expansion and NNTPS for the next 25 years and the shortfall will be met out of the surplus lignite available from Mine-IA. 709.06
33 PARBATPUR CENTRAL COAL MINE  MOC/NA  The project was allotted to Steel Authority of India Limited on 23.03.2016 by MoC, GOI.The project consist of an opencast and an underground mine of total planned production as per approved Mine Plan is 1.24MT.
34 Badam Coal Mine  MOC/NA  The Badam Coal Mine was allotted to Bihar State Power Generation Co. Ltd., Patna for its 2x250 MW BTPS Extension Project, Barauni, Begusarai vide Allotment Order No. 103/20/2015/NA dated 31.08.2015 of MoC, GoI.
35 Muraidih OCP - State Issues  Coal India Limited  It is an OCP under Barora Area
36 Argada OCP  Coal India Limited  Argada OCP is a greenfield Project
37 KUYA Colliery OC-State Issues  Coal India Limited  It is an Opencast under Bastacolla Area
38 CHANDAN OCP - State Issues  Coal India Limited  It is a running OCP of EJ Area of BCCL.
39 BLOCK -II OCP - State Issues  Coal India Limited  It is a running OCP of Block-II AREA of BCCL.
40 NLC TALABIRA THERMAL POWER PROJECT  Neyveli Lignite Corporation  Talabira Mine II & III Coal block is allocated to NLCIL. A pit head Thermal Power Project is planned near Talabira Mines. 17636.78
41 TS II SECOND EXPANSION PROJECT  Neyveli Lignite Corporation  In lieu of instructions from MOEF&CC to go for super critical boiler techniques (2X660MW) instead of 1000 MW earlier. Accordingly approval was obtained to increase linked Mine III capacity from 9.0 to 11.50 MTPA on 09.08.2016. 8733.49
42 MINE III  Neyveli Lignite Corporation  Board of Directors of NLCIL has accorded approval for the expenditure sanction of Rs. 7.05 Crores for Phase-I AAP activities on 23.03.2015. In lieu of instructions from MOEF&CC to go for super critical boiler techniques (2X660MW) instead of 1000 MW earlier. Accordingly approval was obtained to increase Mine capacity from 9.0 to 11.50 MTPA on 09.08.2016.
43 Dumri Coal Block  MOC/NA  Dumri Coal Mine, located in the State of Jharkhand, was vested to M/s Hidnalco through E-auction conducted by the Ministry of Coal, GoI, in 2015 and subsequently the Nominated Authority, MoC, Govt. of India issued the Vesting Order in favour of Hindalco Industries Limited vide Order no.104/24/2015/NA. dated 22-04-2015. The Mine was auctioned in the category of Schedule III Mines with EC and FC stage I already granted to the Prior Allotee of the Block. The prior allotee has also purchased and mutated 410 acres of non forest private land for the purchase of transfer as compensatory afforestation land to Forest Dept for getting stage II FC. The Mine is planned for opening by 22nd Dec 2018 as per the CMPDA signed for getting the vesting order of the Mine. 120
44 Selected Dhori OC  Coal India Limited  Selected Dhori (SDOC) is a brown field open cast coal mining project located in Bokaro district. The project is in Dhori Area of CCL and has a capacity of 11 MTPA.
45 Balkudra OC  Coal India Limited  Balkudra OC is a brown field open cast coal mining project located in Ramgarh district. The project is in Barka Sayal Area of CCL and has a capacity of 1.3 MTPA.
46 Basantpur Tapin Washery  Coal India Limited  Basantpur Tapin Washery is a coking coal washery located in Ramgarh district. It is a greenfield project with a capacity of 4 MTPA.
47 Gare Palma Sector - I, Phase - I integrated (Opencast & Captive Coal Washery)  MOC/NA  Gare Palma Sector - I, Phase - I integrated (Opencast & Captive Coal Washery) mining project in Mand Raigarh Coalfield, Raigarh district in Chhattisgarh State: Coal block is allotted by Ministry of Coal. Mine is having opencast peak rated capacity of 15 MTPA. Total Block Area: 5738.75 Ha. Phase - I area: 3583.81 Ha. 15280.13
48 Amelia Coal Mine  MOC/NA  Amelia Coal Mine is located at Singrauli Distt. of MP State. It is in Main Basin of Singrauli Coal Field. Prior allottee is MP State Mining corporation Ltd, MP. The Mine has been re-allotted to THDCIL vide allotted order no. F. No.103/11/2016-NA Dtd.17.01.2017. The end use plant is Khurja STPP(2x660MW), Khurja, Bulandshahar, UP. As per approved Mine plan, total extractable coal reserve is 277.23 Million Ton. PRC is 7.0 OC & 1.4 UG. As per schedule, opening permission is to be granted in Sept. 2020. Land acquisition and Forest clearance proposal is under process. 1587.16
49 Bicharpur Coal Mine  MOC/NA  Bicharpur Coal Mine was vested to UTCL on 01-04-2015. BCM is and underground coal mine.Prior allocatee had started development of mine (drivage of Inclines 2X1200 m and Sinking of Shaft 220 mts). 6 % of developemnt work was completed and balance 94% of development work is being done by UltraTech Cement Limited. 563
50 Gare Palma IV/4 Coal Mine  MOC/NA  Gare Palma IV/4 Coal Mine, Raigarh, Chattisgarh Gare area is located in Mand Raigarh coalfield and is a large area containing about 3000 million tonnes of coal as per GSI estimate. This area has been divided into 4 sectors viz. I to IV. Sector IV has further been sub-divided into 8 sub-blocks namely IV/1 to IV/8. Gare Palma IV/4 coal blocks was earlier allotted to M/s Jayswal Neco India Limited (JNIL) for captive coal mining. Honourable Supreme Court vide judgment dated 25th August 2014 read with its order dated 24th September 2014 cancelled the allotments of 204 coal blocks including Gare Palma IV/4. In pursuance of the provisions of The Coal Mines (Special Provisions) Second Ordinance 2014, these coal mines were earmarked for non-regulated sector and was put on E-auction by the union government, in which M/S Hindalco Industries Limited emerged as the successful bidder. Accordingly, this coal mine has been vested with M/S Hindalco Industries Limited w.e.f 1st April 2015, vide vesting order no. 104/16/2015/NA dated 23rd March 2015. Subsequently, the block boundary of Gare Palma IV/4 coal mine was revised vide F. No. 104/28/2015/NA dated 13th October 2015 of Nominated Authority, Ministry of Coal, Government of India and certified by CMPDIL vide letter no. CMPDI/BD/C(886-A)/E-175692/I-4079 dated 3rd July 2018. Post certification of block boundary by CMPDIL, area of Gare Palma IV/4 is 885.525 ha. Location and Accessibility Gare Palma IV/4 coal mine is in Gare area of Mand Raigarh Coalfield (south-eastern part) falls under the administrative control of Tamnar Tehsil, Raigarh district in Chhattisgarh. The relevant Topo sheets are 64 N/8 & 12. Gare Palma IV/4 Block is connected to Raigarh, the district headquarters by road. The block is situated at a distance of 55 km from Raigarh. Raigarh is the nearest Railhead on the Howrah Mumbai line of South East Central Railway. Raipur is the nearest airport to the coal mine, which is situated around 330 km from the project site and connected by all-weather road. As per vesting order, coal from this coal mine will be used for captive consumption in the end use plant in Aditya & Hirakud. The Net Geological Reserves (post exploration) is 65 MT. Method of Current Working Coal Production is being done since June, 2006 in Gare Palma IV/4. After re-allocation, due to delay in obtaining required permissions, production was restarted from Gare Palma IV/4 from December 2015. The mines achieved Peak Rated Production of 1MTPA in FY 2016-17. Underground- Drilling Blasting in Bord & pillar method with LHD and evacuation by Belt Conveyor. Open cast- Drilling Blasting/ Shovel Dumper combination/ Ripper Dozer/Surface Miner. 5.5 MT of reserves have been extracted till 31st March 2018 from this mine since inception. 162.23
51 Gare Palma IV/5 Coal Mine  MOC/NA  Gare Palma IV/5 Coal Mine, Raigarh, Chattisgarh Gare area is located in Mand Raigarh coalfield and is a large area containing about 3000 million tonnes of coal as per GSI estimate. This area has been divided into 4 sectors viz. I to IV. Sector IV has further been sub-divided into 8 sub-blocks namely IV/1 to IV/8. Gare Palma IV/5 coal block was earlier allotted to M/s Monnet Ispat & Energy Limited (MIEL) for captive coal mining. Honourable Supreme Court vide judgment dated 25th August 2014 read with its order dated 24th September 2014 cancelled the allotments of 204 coal blocks including Gare Palma IV/5. In pursuance of the provisions of The Coal Mines (Special Provisions) Second Ordinance 2014, these coal mines were earmarked for non-regulated sector and was put on E-auction by the union government, in which M/S Hindalco Industries Limited emerged as the successful bidder. Accordingly, this coal mine has been vested with M/S Hindalco Industries Limited w.e.f 1st April 2015, vide vesting order no. 104/13/2015/NA dated 23rd March 2015. Subsequently, the block boundary of Gare Palma IV/5 coal mine was revised vide F. No. 104/28/2015/NA dated 13th October 2015 of Nominated Authority, Ministry of Coal, Government of India and certified by CMPDIL vide letter no. CMPDI/BD/C(886-A)/E-175692/I-4079 dated 3rd July 2018. Post certification of block boundary by CMPDIL, area of Gare Palma IV/5 is 797. 66 ha. Location and Accessibility: Gare Palma IV/5 coal mine is in Gare area of Mand Raigarh Coalfield (south-eastern part) falls under the administrative control of Tamnar Tehsil, Raigarh district in Chhattisgarh state. The relevant Topo sheets are 64 N/12. The Gare Palma IV/5 Block is connected to Raigarh, the district headquarters by road. The block is situated at a distance of 55 km from Raigarh. Raigarh is the nearest Railhead on the Howrah Mumbai line of South East Central Railway. Raipur is the nearest airport to the coal mine, which is situated around 330 km from the project site and connected by all weather road. As per vesting order, coal from this coal mine will be used for captive consumption in the end use plant in Aditya & Hirakud. The Net Geological Reserves (post exploration) is 143 MT. Method of Current Working- Coal Production is being done since 2004 in Gare Palma IV/5. After re-allocation, due to delay in obtaining required permissions, production was restarted from Gare Palma IV/5 from April 2016. The mine has achieved Peak Rated Production of 1MTPA each in FY 2016-17. Underground- Drilling Blasting in Bord & pillar method with LHD and evacuation by Belt Conveyor. Open cast- Drilling Blasting/ Shovel Dumper combination/ Ripper Dozer/Surface Miner. 10 MT of reserves have been extracted till 31st March 2018 from this mine since inception. Along with development of coal seams in underground, depillaring with stowing by bottom ash / crushed OB have been initiated in Seam II of Gare Palma IV/5 as pilot project with the permission of DGMS. 181.83
52 Detailed coal exploration in Mahan North and Mahan South Block, Bisrampur Coalfield  Coal India Limited  Detailed coal exploration in Mahan North and Mahan South Block, Bisrampur Coalfield, District - Balrampur and Surguja, Approximate area of block 54.5 Sq.Km., Anticipated Meterage 43000 m. Work order issued on 22.03.2016.Drilling started on 23.03.2016 and a total of 3498.5m was drilled till 24th July 2016.Drilling stopped due to stiff local resistance. No drilling since 24 July 2016. 7.5
53 PACHHWARA NORTH COAL MINE  MOC/NA  Pachhwara North coal mine was previously allotted to BECML and they ran the mine up to 31.03.2015 when it was de allocated as per order of Honble Supreme Court and was re allocated in favour of WBPDCL. BECML extracted an amount of 3.48 MMT of coal up to 31.03.2015. Balance reserve of the mine is 389.36 MMT. The project is spread over an area of 1265 Ha and minable area is 1218 Ha including both forest and non forest land. As because Stage II Forest Clearance has not yet been obtained, WBPDCL prepared a seperate Mine Plan for non forest area of 846.93 Ha and has already executed and registrar the Mining Lease deed for it. All statutory compliances have been obtained for opening the mine except permission from CCO which is expected to be obtained within a few days. 1368.32
54 PSPCL - Pachwara Central Coal Mining Project  MOC/NA  blank 400
55 Araanya Mines Pvt. Ltd. - Lohari Coal Mine  MOC/NA  Lohari Coal Mine allotted under auction to M/s Araanya Mines Pvt. Ltd. a Joint Venture (JV) of M/s Aloke Steels Industries Pvt. Ltd. and M/s Maa Chhinnmastika Cement and Ispat Pvt. Ltd. both the JV Units having DRI (Sponge Iron) Units. The coal is the major raw material for DRI production. The mined coal will be used for production of Sponge Iron. The Vesting Order is issued vide order no. 104/30/2015/NA dt-22.04.2015 505
56 Manoharpur and Dipside Manoharpur coal mine project  MOC/NA  Manoharpur and Dip-side of Manoharpur are two contiguous coal blocks allotted to Odisha Coal and Power Limited under the Coal Mines (Special Provisions) Act, 2015. The Coal blocks were allotted to OCPL in order to cater the fuel requirement of the 4X660 MW expansion power plants of Odisha Power Generation Corporation Limited. The two coal blocks are situated in Sundargarh district of Odisha. 1382
57 Gidhmuri & Paturia Coal Block  MOC/NA  Allottee company should fill 2010
58 Gare Pelma Sector-III Coal Block  MOC/NA  Coal Block allocated by Ministry of coal on 14/09/2015. Forest and Environment Clearance transferred in name of CSPGCL on 18.04.2017 & 19.04.2017 respectively. Mining lease granted on 08.12.2016. Coal Mine Service Agreement (CMSA) signed with M.D.O. on 16.11.2017. R&R plan approved by Commissioner, Bilaspur on 04-09-2018 704
59 Tubed Coal Mine  MOC/NA  Allotment Order No.103/04/2016/NA dated 07th October,2016. Total Mining Lease Area- 460 Hectare, Forest Land- 162.349 Hectare. The villages within coal block area are Tubed, Mangra, Dihi, Ambajhara, Dhobiajharan, Nawari. The project area is about 8 kilometers from Latehar town and 13 kilometers from Latehar Railway station. Terms of Reference (TOR) for EIA Study granted on 16.03.2018 (Proposal no. IA/JH/CMIN/65302/2017). EIA Report submitted to State PCB on 30.07.2018 for conducting Public Hearing. Proposal for diversion of Forest land vide no. FP/JH/MIN/29167/2017 was submitted on 25.09.2017 and is under process. Land acquisition for coal block area is being done under the Coal Block Area (Acquisition and Development) Act,1957 and notification u/s 9(1) issued on 04.07.2018. M/s Develecto Mining Limited (a consortium of M/s SICAL, AMbey Mining Private Limited, Godavari Commodities Limited) is the Mine Developer and Operator. 1287.89
60 Detailed coal exploration in Haripur Chaparia Block, Rajmahal Coalfield  Coal India Limited  Detailed coal exploration in Haripur Chaparia Block, Rajmahal Coalfield, District - Dumka, Approximate area of block 10.45 Sq.Km., Anticipated Meterage 40000 m. Work order issued on 02.04.2015. 12.7
61 Rajbar E&D  MOC/NA  The Coal Mine has been allotted to TVNL for proposed Specified End Use Plant of 2 X 660 MW Plant at Lalpania, Dist. Bokaro, Jharkhand. The Coal Mine is situated in Latehar Dist of the State of Jharkhand. The annual Peak Rated Capacity of the Mine is 10 MTPA. 1000
62 Baitarni-West coal mine  MOC/NA  Baitarni-West coal mine has been allotted to Odisha Mining Corporation ltd. on dt. 29.9.2016. This is an explored block with mineable coal reserve of 468 MT. 3100
63 UPRVUNL-Saharpur Jamarpani Coal Block  MOC/NA  Saharpur-Jamarpani Coal Block located in Dumka District is being developed by Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited, U.P for coal supply to upcoming thermal power projects. 400
64 Coal Project (Baranj I-IV, Manoradeep and Kiloni)  MOC/NA  Baranj I-IV, Manoradeep and Kiloni coal mines situated in Chandrapur District of Maharashtra State. This coal block is allotted to meet the coal requirements of Bellary TPS Unit 1 & 2 ( 2 x 500 MW).
65 KHAGRA-JOYDEV COAL BLOCK  MOC/NA  Ministry of Coal, Government of India acting through its Nominated Authority has allotted Khagra-Joydev coal mine located near Dubrajpur in Birbhum district of West Bengal state vide their order no. 103/9/2015/NA dated 31st March 2015 to DVC for utilisation of coal in their end use plants under the provisions of the Allotment Agreement. DVC appointed a consortium of GDCL-AMPL-GCL as MDO to undertake development of infrastructure & operation of Khagra-Joydev opencast coal mine Project and supplying of coal to its Thermal Power Plant, in terms of the Contract Agreement executed between DVC & SPV formed by the appointed consortium. A SPV named Khagra-Joydev Resources Pvt Limited (KJRPL) was formed by the consortium and the agreement was signed on 12.06.2017 2176.39
66 TALABIRA II & III OCP - 23 MTPA  Neyveli Lignite Corporation  Talabira Coal Block was allotted to NLC India Ltd. for the 2 Joint Venture projects : 1. Neyveli Uttar Pradesh Power Limited (NUPPL) at Ghatampur (JV with UPRVUNL) & 2. NLC Tamil Nadu Power Ltd (NTPL)in Tamil Nadu (JV with TANGEDCO) 2401.07
67 NEYVELI NEW THERMAL POWER PROJECT - 1000 MW  Neyveli Lignite Corporation  The existing Thermal Power Station TPS-I of 600 MW is continuously in operation since 1961 and it has been decided to phase out the operation of the Units and to set up a 1000 MW Thermal Power Plant at Neyveli viz. Neyveli New Thermal Power Station (NNTPS) in its place. The project has been sanctioned by GoI. Order has been placed for Steam Generator and Auxiliaries and Turbine Generator and Auxiliaries packages on M/s BHEL. 7080.41
68 TUBED COAL MINE  MOC/NA  Allotment Order No.103/04/2016/NA dated 07th October,2016. Total Mining Lease Area: 460 Hectare, Forest Land: 162.349 Hectare. The villages within coal block area are Tubed, Mangra, Dihi, Ambajhara, Dhobiajharan, Nawari. The project area is about 8 kilometers from Latehar town and 13 kilometers from Latehar Railway station. Terms for EIA Study granted on 16.03.2018 (Proposal no. IA/JH/CMIN/65302/2017). Proposal for diversion of Forest land vide no. FP/JH/MIN/29167/2017 was submitted on 25.09.2017 and is under process. Land acquisition for coal block area is being done under the Coal Block Area (Acquisition & Development) Act,1957. M/s Develecto Mining Limited (a consortium of M/s SICAL, AMbey Mining Private Limited, Godavari Commodities Limited) is the Mine Developer and Operator. 1300
69 Dumri Coal Mine  MOC/NA  The Dumri coal mine has been allocated to M/s Hindalco Industries Ltd vide Vesting order 104/24/2015/NA dated 22.04.2015 in accordance with the provisions of Coal Mines (Special Provisions) Act 2015, and the rules framed there under. The project is located in Hazaribag District of Jharkhand. The mine was auctioned as Schedule III mines having FC stage I and EC already granted to the prior allotee of the Coal Block. 110
70 Doubling of Ramna-Singrauli, Billi-Chopan and Karela Road-Shakti Nagar Rail lines  Coal India Limited  Railway has taken up doubling of Ramna-Singrauli, Billi-Chopan and Karela Road-Shakti Nagar Rail lines with scheduled completion of 2019-20, 2018-19 and 2018-19 respectively. Doubling of these lines is required for target coal dispatch to upcountry power plants from NCL from 2018-19.
71 Durgapur Extn. Deep OC  Coal India Limited  Brown Field Opencast Project, Reserve - 47.27 Million Te., Sanction Date - 02/02/17, EC for Phase II (with Forest land) under consideration at MoEF,Grade of Coal - G10, Stripping Ratio - 6.58, Life of Project - 17 years. 378.87
72 Kerandari  MOC/NA  NTPC the allocatee of Kerandari block has received approval of mining plan & mine closure plan from MOC, Stage I Forest Clearance and Environment Clearance from MOEF&CC, Consent to Establish from SPCB. Land acquisition and MDO appointment are under progress. 1300
73 Naini Coal Mine  The Singareni Collieries Company Limited  Naini coal mine is allocated to M/s SCCL by MoC, GoI vide order No.103/21/2015/NA, dated 13.08.2015 with time-lines for consistent supply of coal to STPP. This is green field Project. The coal block is located in Angul District of Odisha State
74 TALABIRA II & III COAL BLOCK  Neyveli Lignite Corporation  TALABIRA II & III COAL BLOCK was allocated to NLC India Limited for the Joint Venture projects : 1. Neyveli Uttar Pradesh Power Limited, a Joint Venture between NLC India Limited and UPRVUNL, located in Ghatampur Tehsil, Kanpur Nagar Dist, Uttar Pradesh & 2. NLC Tamil Nadu Power Limited,a Joint Venture between NLC India Limited and TANGEDCO, in Tamil Nadu. 2467.58
75 PACHWARA SOUTH COAL BLOCK  Neyveli Lignite Corporation  Ministry of Coal (MoC), Govt. of India has allocated Pachwara South Coal Block (PSCB) which is having the total coal reserve of 305 MT in the State of Jharkhand to Neyveli Uttar Pradesh Power Ltd (NUPPL) to cater the coal requirement of 1980 MW coal based Super Critical NUPPL Project, on 25.07.2013. 2095.09
76 Neyveli Uttar Pradesh Power Project Limited  Neyveli Lignite Corporation  3X660 MW Thermal Power Plant in Ghatampur Tehsil of Kanpur Nagar, District, in Joint Venture between NLC and UP Rajya Vidyut Utapadan Nigam Ltd. GoI sanctioned the project vide Order No. 43011/2008-CPAM dated 27.07.2016. 17237.8
77 MADANNAGAR OC PROJECT  Coal India Limited  Madannagar OC is a Greenfield project. PR approved in Oct. 2015 by CIL Board.The capacity is 12 MTY. 1875.32
78 MALACHUA OC PROJECT  Coal India Limited  Malachua OC is a Greenfield project. PR approved in Oct. 2015 by SECL Board.The capacity is 3 MTY. 488.33
79 5.0 MTPA patherdih nlw washery  Coal India Limited  With a view to supply improved quality and sized coal to the consumers , BCCL Board had sanctioned construction of this washery in Feb,2011.The capacity is 5 MTY. 269.82
80 Development of Railway Siding for dispatch of washed coal of Integrated Lakhanpur-Belpahar-Lilari OCP at IB-Coalfields of MCL.  Coal India Limited  Project Area : Lakhanpur Area The entire Project is divided into two phases : Phase-I : 10 MTPY Route Length : 2 KM Track Length : 8.06 KM Project Cost : Rs.62.89 Crs. M/s RITES Ltd. has been engaged for preparation of Feasibility Study Report and Detailed Project Report. Phase-II : 20 MTPY Phase-II will be taken up after completion of Phase-I 161.11
81 Rail Connectivity of Lingaraj SILO with Talcher mainline and NTPC captive line and its Doubling at Talcher Coalfields of MCL.  Coal India Limited  Project Area : Lingaraj Area Route Length : 2.1 KM Track Length : 8 KM Executing Agency : RITES Ltd. 178.95
82 Rail connectivity of Lingaraj SILO with existing Deulbeda Siding at Talcher Coalfields of MCL  Coal India Limited  Project Area : Lingaraj Area Total Track Length : 3.6 KM. Executing Agency : East Coast Railway 43
83 Jharsuguda-Barpali-Sardega Rail Link at IB Coal Field of MCL in Odisha.  Coal India Limited  Total Length : i)52.412 Km upto Barpali with Barpali Bulb ii) 50.30 Km upto Sardega without Loading Bulb No. Of Station : 05 nos Executing Agency : South Eastern Railway, Kolkata It will serve Kulda, Garjanbahal, Siarmal and Basundhara (West) OCPs. 1044
84 Railway line from Bhadrachalam to Satuupalli(53.20Km)  The Singareni Collieries Company Limited  Railway line from Bhadrachalam Road to Sattupalli is proposed to transport the coal from 4 No of SCCL mines namely JVR OC I (4.00MT), JVR OC II (10.00 MT), JVR OC III (4.00 MT) and Kistaram OC (2.00 MT) and to comply the EC condition which reads as “No coal transportation shall be undertaken by road”. Total length of the railway line is 53.20 km. Period of construction is 3 year. Railway line was sanctioned in Railway budget in 2010-11. 360
85 2.5 MTPA Dugda NLW Washery-Rail Siding  Coal India Limited  Renovation and modification of existing Railway Siding at Dugda Coal Washery of BCCL. -Track Length 17.5 Km. 77.82
86 1.6 MTPA Dahibari NLW Washery- Rail Siding  Coal India Limited  Renovation/Strengthening of Existing Railway Siding at Dahibari of CV Area. Track length- 6.20 Km. 45.3997
87 2.0 MTPA, Bhojudih NLW Washery-Rail Siding  Coal India Limited  Renovation/Strengthening of existing Railway Siding at Bhojudih Washery for 2.0 MTPA Project. Track Length- 5.76 Km. 62.17
88 PR siding connecting to Silo of Block-B OCP  Coal India Limited  PR siding 6.39 km connecting Silo of Block-B OCP to Katni-Chopan Railway line of EC Railway is to be constructed for dispatch of coal from Block-B OCP. 48.81
89 PR line connecting to Silo of Krishanshila OCP  Coal India Limited  906 m length of PR line connecting to Silo of Krishnashila CHP (under construction) is to be constructed for dispatch of coal from Krishnashila by Railway in addition to the dispatch to linked consumer by Belt-pipe conveyor. 20.5
90 KBJ line diversion for accommodation of infrastructure & Dump of Khadia Expansion OCP (4 to 10 Mty)  Coal India Limited  Part of KBJ section 3.7 Km, branching from Chopan-Katni Railway line of EC Railway is to be diverted for accommodation of infrastructure and OB Dump of Khadia Expansion OCP (4 to 10 Mty). 31.28
91 Amlohri Railway Siding via Nigahi as per Project Report of Amlohri/Nigahi Expansion OCP  Coal India Limited  Extension of PR line 5.8 km. from Jayant to Amlohri connecting Silo of Nigahi and Amlohri Expansion OCPs for dispatch of coal by railway in addition to MGR of linked TPPs 64.57
92 Manikpur Rail Under Bridge (RUB)  Coal India Limited  Project work is for construction of RUB for facilitating OB removal from eastern query to western query of Manikpur OC through RITES as per MoU between CIL & RITES 40
93 Batura Siding  Coal India Limited  Project work is for construction of Rail infrastructure for Batura group of mines through RITES as per MoU between CIL & RITES. Total length starting from Anuppur station is 16.50 km. This siding will handle approximately 5 MT coal per annum of three mines namely, Rampur Batura OC, Batura West OC and Batura Highwall of Sohagpur Area 104.29
94 Kusmunda Siding  Coal India Limited  Project work is under Project Management Consultancy through RITES as per MoU between CIL & RITES. Approximately 40 MT coal of Kusmunda OCP will be handled through this siding. Length of siding is 3.1 km and total length of track is 24 km. 221.78
95 Konar Railway Siding  Coal India Limited  Konar Railway Siding is proposed for dispatch of coal from Konar OCP. The siding is to take off nearby Jarangdih Railway Station level crossing and is to be constructed between Bokaro Thermal Power Station (BTPS) and Jarangdih Station. Route length of the Siding is 2.3 KM (Approx). 15.91
96 North Urimari Railway Siding  Coal India Limited  North Urimari Railway Siding is proposed for dispatch of coal from Urimari OCP. The siding is to take off from Patratu Station. Route length of the Siding is 10.8 KM and total track length is 19.5 KM. 201.57
97 Amrapali Railway Siding  Coal India Limited  Amrapali Railway Siding is proposed for dispatch of coal from Amrapali OCP. The siding is to take off from Manatu Station on Tori-Shivpur Rail Line. Route length of the Siding is 15.6 KM and total track length is 29.3 KM. 374.89
98 Magadh Railway Siding  Coal India Limited  Magadh Railway Siding is proposed for dispatch of coal from Magadh OCP. The siding is to take off from Bukru Station on Tori-Shivpur Rail Line. Route length of the Siding is 14.6 KM and total track length is 28.35 KM. 391.09
99 Rail infrastructure/ Railway siding at Sonepur Bazari Comb. OCP  Coal India Limited  This railway project intents to handle loading & dispatch of projected production of coal from Sonepur Bazari Comb. OCP. M/S RITES has been engaged as consultant & supervisor as per MOU with CIL. The entire cost of the project is to be borne by ECL within overall capital of Sonepur Bazari Comb. OC “ongoing” coal project. It involves construction of rail line of about 6.5 km (route length) with total track lying of 17.1 km. The alignment of the proposed siding has been planned with “Y” connection to provide entry & exit from both Pandaveswar as well as Andal end. In the loading terminal two separate loading SILO have been provided connecting the pre-loading & post-loading lines for simultaneous loading of two rakes. However, as per latest decision, proposal for construction of SILO is to be replaced with two nos of 500T surge hoppers with rapid loading system. A full length wharf-wall siding is also being constructed (at Chainage 4 Km) from where coal will dispatched through this rail infrastructure. 108.15
100 Gare Pelma Sector-III Coal Block  MOC/NA  The MoC Govt of India vide letter No 103/23/2015/NA dtd 24.03.2015 allotted the GP-III coal block in Dist. Raigarh to CSPGCL. The earlier allottee was GoaIDC. The FC and EC has been issued by MoEF which is in the name of GOAIDC CSPGCL have applied to MoEF through NoM Authority, MoC for transfer of FC and EC clearances from M/s GIDC to CSPGCL. 704