JavaScript is Required
Accepted Project Details
Showing Record(s) 1 to 2 of Total 2 Green Box -Project where all Issues are resolved
S.No Project Name Sponsoring CPSE Description of Project
(As furnished by the applicant)
Estimated Investment(in Crores)
1 Pipeline Network Project, Geleki  Oil and Natural Gas Corporation Limited (ONGC)  Project envisages replacement of Geleki field pipeline network through installation of Field Manifolds, Feeder/Collector Lines and Well-fluid, Gas-lift and Water Injection/flushing Lines of approximately 418 km. length 249.85
2 Field Development Plan of Madanam NELP-IV Block CY-ONN-2002/2  Oil and Natural Gas Corporation Limited (ONGC)  Project envisages cumulative production of 1.048 MMT of oil by 2027-28 and 2.702 BCM of gas by 2032-33 Scope of work- Construction of one CPF at Madanam, Laying of 6 inches of 57 km oil pipeline from Madanam to Narimanam, Laying of 16 inches of 32 km gas pipeline from Madanam to Kuthalam up to GAIL gas grid, Drilling and completion of 16 wells (15 new and 1 substitute well) 650.82
Go to Navigation