JavaScript is Required
Accepted Project Details
Showing Record(s) 1 to 15 of Total 16 Green Box -Project where all Issues are resolved
S.No Project Name Ministry-Dept. Description of Project
(As furnished by the applicant)
Estimated Investment(in Crores)
1 Sobhan Singh Jeena Medical College, Almora ,Uttarakhand  Medical Education  Basic Infrastructure of Medical College, of 100 seats capacity, as per norms for same as well as reconstruction/up gradation work of existing base hospital so as to be suitable for Medical College teaching hospital (as per MCI Norms) 327.02
2 R-APDRP Part - B  Uttarakhand Power Corporation Ltd.  System Improvement, Strengthening and Augmentation of distribution system to bring down AT&C Losses, establish SCADA compatibility and improve quality of consumer supply in town to be carried out under R-APDRP Part-B scheme. 584.1
3 Kaldigad SHP (9.0 MW)  Energy  River: Kaldigad Capacity : 9.0 MW Annual Energy Generation : 56.3 MU Project was under construction at the time of flash floods during year 2012 and the project was damaged badly. 103.45
4 Asiganga SHP II (4.5 MW)  Energy  River : Asiganga Capacity : 4.5 MW Annual Energy Generation : 20.38 MU Project was under construction at the time of flash flood during year 2012 and project was damaged badly. 63.54
5 Vyasi Hydro Electric Project (120 MW)  Energy  River : Yamuna Location of DAM : Village Vyasi, 5.0 Km. d/s of Lakhwar Location of Power House : Village Hathiari 9.5 Km d/s of Lakhwar 936.23
6 Dehradun Mussoorie Ropeway  Tourism Department  Development of 10 km aerial passenger ropeway from Purkulgaon to Hathipaon and from Hathipaon to Library Point, Mussoorie with the development of multi-level parking at Mussoorie and eco-tourism development at Hathipaon. 500
7 Construction of Vidhan Sabha Bhavan and allied works at Gairsain Distt. Chamoli, Uttarakhand  Vidhan Sabha  The project includes construction of Vidhan Sabha Bhavan including the Assembly building, offices of the officers and staff catering to the Assembly, MLA hostel, Officers hostel, VIP residences and VVIP residences. 105.03
8 Construction of Vidhan Bhawan and Secretariat Complex at Raipur, Dehradun  Estate Department  Being a new State, there is a need of Office Buildings for Legislative Assembly and Secretariat. At present offices of Legislative Assembly & Secretariat are conducted at different places. These arrangement are temporary and Inadequate. Therefore, it has been decided to construct office buildings and residential building in Raipur, Dehradun. 470.8
9 Constructon of Dobra Chanthi Heavy Vehicle Suspension Bridge  PWD  This is a important heavy vehicle suspension bridge. 154
10 Reconstruction of Kotdwar Kalagarh Ramnagar Motor Road  PWD  Important project to connect garhwal & kumaun. 375.32
11 Dehradun Sewerage Scheme for Zone M,C,D,J and part of L under 13th Finance Commission  Drinking Water Department  The project is under execution and is for providing the Sewerage facilities to the unsewered areas of Dehradun city named as zone M,C,D,J and part L. It also consists of two STPs at Mothorawala and Kaulgarh of 20 MLD and 3 MLD capacity respectively. 170.46
12 MUSSOORIE SOURCE AUGMENTATION PUMPING WATER SUPPLY SCHEME FROM YAMUNA RIVER  Drinking Water Department  Mussoorie water supply scheme with four stage pumping has been proposed to minimize the capitalized cost and O&M as well for which following proposals have been made in the estimate:- An intake well or battery of infiltration will be constructed at Yamuna River and water has to be lifted from RL700m to Vincent hill (RL 2150m) in four stages. Mussoorie water supply scheme with four stage pumping has been proposed to minimize the capitalized cost and O&M as well for which following proposals have been made in the estimate:- An intake well will be constructed at Yamuna River and raw water has to be lifted from RL700m to Vincent hill (RL 2150m) in four stages. Raw water will be pump from Intake well to treatment plant proposed to be constructed at RL of 950m. First Stage is proposed to lift clear water from MPS (From RL 950m) to Ist IPS( RL 1350m.). IInd stage is proposed to lift clear water from Ist IPS (RL 1350 m) to IPS IInd (RL 1750m). IIIrd stage is proposed to lift clear water from IPS IInd (RL 1750m) to Top CWR (RL 2150m). Water storage sumps- (a) Clear water sump of 4500 KL is proposed to be constructed at MPS site after treatment units. Clear water sump of 500.00 KL capacity is proposed to be constructed at IPS Ist to pump clear water to IPS IInd. Clear water sump of 500.00 KL capacity is proposed to be constructed at IPS Ist and IInd. Top RCC CWR of 4000.00 KL capacity is proposed to be constructed at Vincent hill Rising Main 19300 m of API X-65 grade (400mm dia) is proposed to be laid to lift water from Intake well to Top CWR at Vincent hill. Three nos. of Pump house of size 8m x 6m each at MPs, IPS Ist and IPS IInd have been proposed to be constructed. Staff quarters are proposed to be constructed at site of MPS, IPS Ist and IPS IInd as per departmental type SCADA and Automization. 114.315
13 Kakoragad SHP (12.5MW)  Energy  Renewable energy run of river Small Hydropower Project (12.5MW) under Implementation Agreement with Uttarakhand Government to be constructed in remote and border region. 103
14 Siyangad SHP (11.5MW)  Energy  Renewable energy run of river Small Hydropower Project (11.5MW) under Implementation Agreement with Uttarakhand Government to be constructed in remote and border region. 106
15 Jalandharygad SHP (24MW)  Energy  Renewable energy run of river Small Hydropower Project (24MW) under Implementation Agreement with Uttarakhand Government to be constructed in remote and border region. 222
next last
Go to Navigation